Alex hired RM wraps for one of our most extensive architectural film install projects ever in February 2020. Almost every single solid surface except for the floors on both the upper main deck and the lower cabin deck was wrapped. Overall this big project took Randy 21 days to complete, using almost 4 full rolls of material. Unfortunately the Covid pandemic started ramping up right as this project was completed, and Randy stopped traveling for installation projects for over a year after he got back home from this project in Florida.
There were a LOT of pieces to finishing this puzzle, including some truly intricate panels & furniture pieces - check them out in the photos and videos below.
Finished Walkthroughs
Upper Deck Finished Walkthrough
Lower Deck Finished Walkthrough
You can full-screen the videos by pressing F on your keyboard after clicking play.
Starting In The Galley
This was perhaps the quickest and most straight-forward portion of the whole project, because all the surfaces were flat. Still, there were a few intricate pieces that took some meticulous work in the air vent above the refrigerator, and the shelf accent pieces.
Main Saloon Area
So. Many. Curves! All of the natural light coming into this space helped accentuate the pattern in the leather architectural film.
Wrapping The Doors & Trims
This project was so big, that even the doors and trim get their own section. Overall there was 14 doors (either storage, or bulkhead) that got wrapped - all of them with included trim, and most of them being wrapped on both sides. All doors and trim were wrapped in Belbien material.
Vanity/TV in Master Cabin
Another major feature of this job was the vanity area in the master cabin. The complex curves and recessed areas required several individual pieces of vinyl, ample use of heat to stretch and contour the film, and lots of patience, but it came out looking great.
Master Cabin - Other Features
Bulkheads Throughout
Almost every bulkhead on the lower deck was stripped down to the base plaster/fiberglass and wrapped in Belbien DA-82 Carta Wrinkled Abstract Pattern architectural film. Some accent parts of the bulkheads on the upper deck were wrapped as well to match the rest of the wrapped pieces.
Why to Choose Refinishing with Architectural Films
Unmatched Speed & Zero Unnecessary Grounding
Every day your vessel sits at the dock for a traditional wood veneer refit, it costs you thousands in lost utility or charter revenue. Traditional sanding, varnishing, and curing (and/or re-fabrication) can ground you for weeks or months. We can apply premium architectural films directly to stable existing substrates on-site with minimal prep required. Our entire process takes days or weeks—not months—allowing you to get back in the water quickly.
Unobtrusive On-Site Installation
Traditional joinery and wood restorations require extensive demolition, loud machinery, and toxic, foul-smelling solvents that disrupt all other onboard activities. We provide a completely clean, practically-silent installation process. Our master installers work seamlessly alongside your scheduled mechanical maintenance teams.
Advanced Architectural Films vs. Heavy Replacement
Our elite refits utilize world-class architectural films (like 3M DI-NOC) that perfectly mimic the texture, depth, and grain of natural exotic woods, brushed metals, and luxury leathers. These wrap materials are purpose-made to provide premium, factory-grade finishes, while being engineered to stand up to everyday wear and tear and still look brand-new years into service. They allow us to create dramatic transformations without the massive cost, environmental waste, or heavy weight penalties of total material replacement.