8/28/26

Boat Interior Vinyl Wrap | Day 2 Progress – 16 Doors, Frames & Fridge Wrap Installation

Follow our progress on this boat interior vinyl wrap project. See how we handle doors, frames, and refrigerator installations in two days.

This video provides a walkthrough of the work completed during the second day of a major interior renovation on a work boat. We focus on the installation of architectural films to refresh various spaces, including hallways, stairwells, and the kitchen area. By watching the application process, you can see how we manage seven different doors, utilizing both full and front-facing wraps to achieve a clean, professional finish.

We also touch on the durability of these materials, referencing past projects that have remained in excellent condition for over three years. Whether you are considering a boat interior vinyl wrap for your own vessel or looking for tips on custom door wraps, this progress log highlights the precision required for a successful upgrade. Seeing the completed work on the fridge and door frames demonstrates the potential for restoring high-traffic areas with the right technique.

RM Wraps Elite

Randy Miller 

info@rmwraps.com - 208-696-1180

Previous

How to wrap in the grove area using the Architectural film

Next

How do wrap a Drawer door